top of page
WWC Water Tools & Municipal Resources
Modeled for Texas municipalities pursuing TWDB funding (WSIG, DWSRF, EDAP, SWIFT).

Water Loss & Audit Tools
Directly tied to TWDB's mandatory reporting.
Tool | What it does | Why it matters to your towns |
|---|---|---|
TWDB Water Loss Audit Portal | Official portal where retail public water suppliers file their required Water Loss Audit | Systems with >3,300 connections file annually; ≤3,300 connections file every 5 years (next due May 1, 2026 for many small systems) — this is the single most common compliance gap you'll find in discovery calls |
AWWA Free Water Audit Software (FWAS) | Industry-standard spreadsheet tool to calculate real loss, apparent loss, and Infrastructure Leakage Index (ILI) | Feeds directly into the TWDB Water Loss Audit and gives you defensible loss numbers for a WSIG/DWSRF narrative |
TWDB Water Loss Dashboard | Interactive statewide dashboard of water loss KPIs by utility, pulled from filed audits | Good for benchmarking a prospective city against peers in a discovery deck |
MRWA Leak/Break Tracking Calculators | Circular break, hole-in-pipe, and rectangular break flow-loss calculators; hydrant/pipe flush flow calculator | Small operators use these hand-calculators in the field; linking out here builds goodwill without you having to build the math yourself |
Need funding to fix what your audit finds? We help Texas cities secure WSIG, DWSRF, and SWIFT funding at no upfront cost.
Conservation & Drought Planning
The two documents TWDB and TCEQ require before/during funding.
Tool | What it does | Why it matters to your towns |
|---|---|---|
TWDB/TCEQ Model Drought Contingency Plans (Regional Water Plans) | Template DCP language by region | Useful starting point for small towns with no plan at all |
TCEQ Drought Contingency Plan guidance | Requirements and model plans for the Drought Contingency Plan (DCP), required of all retail public water suppliers | Every system needs one on file even if not submitted to TCEQ (only ≥3,300-connection systems must submit) — an easy "do you have this?" qualifying question |
TWDB Conservation Information Dashboard (GPCD) | Lets a city look up its own historical gallons-per-capita-per-day (GPCD) trend | GPCD and 5-/10-year GPCD goals are a required table in every Water Conservation Plan — this saves the city (and you) a records request |
TWDB Water Conservation Plan guidance & checklist | Official requirements and a fillable checklist for the 5-year Water Conservation Plan | Required for any TWDB financial assistance over $500,000 — this is a hard gate for WSIG/DWSRF/SWIFT applicants |
Need funding to fix what your audit finds? We help Texas cities secure WSIG, DWSRF, and SWIFT funding at no upfront cost.
Efficiency & Conservation Calculators (Public-Facing)
Lower-stakes tools a town can hand to residents — good engagement/PR content.
Tool | What it does |
|---|---|
TWDB Irrigation Efficiency Tools | Pivot-irrigation efficiency spreadsheet and scheduling tools (relevant for agriculture-adjacent West Texas towns) |
EPA WaterSense Water Budget Tool | Compares landscape/irrigation design water use against a budget using local climate data |
EPA WaterSense Product Search | Searchable database of certified water-efficient toilets, faucets, showerheads, and irrigation controllers |
EPA WaterSense Calculator | Estimates household water, energy, and cost savings from WaterSense-labeled fixtures |
Reference & Best-Practice Guides
Resource | What it is |
|---|---|
TWDB Water Conservation Plan Guidance — "What is a WCP?" | Plain-language explainer you can link for city staff who've never written one |
TWDB Best Management Practices Guide (Water Conservation Implementation Task Force) | 21 municipal and agricultural best-management practices for conservation programs |
bottom of page
